The six-story Chief Peter John Tribal Building(CPJTB) was originally designed for Nerco Minerals and construction was completed in 1984 or 1985. The existing Exterior Insulation Finish System (EIFS) of the building is worn and in need of spot repairs and re-coating. The goal of this project is to provide the entire exterior of the building with a “refreshed” look of uniform appearance, texture, and finish and improved weather protection.
A new penthouse addition was constructed at the northwest side of the building in 2018. EIFS repairs at this addition is excluded from this project scope of work. Re-coating will be required. For more details see RFB packets below.
Mandatory Bidder Registration
To be eligible to submit a bid for this project, Bidders must formally register by emailing the Arcadis Project Administrator, Allison Murrell at allison.murrell@arcadis.com and Project Manager, Rodney Mohr at rodney.mohr@arcadis.com. Include firm name, address, telephone and name and email address of contact person.
Mandatory Contractor Walk-Through: An on-site walk-through will be conducted on Wednesday, May 19, 2021 at 4:00 PM (AKT). Please meet outside the main entry on the North side of the CPJTB at 122 1st Avenue. Face coverings are required, and social distancing will be encouraged throughout the walk-through.